Troubleshoot by client project

Connections, builds, renewals & shutdowns

Start with the current order, then tackle the task at hand. Find separate guides for connecting for the first time, managing client signing, setting up the build environment, and wrapping up a project—without scrambling before delivery.

Use the current order in your console to confirm connection details, actual availability, and expiration date.

Order activated

Connect using your order details

Each order includes one dedicated physical Mac mini, not a virtual machine. Check the client project and order number first, then copy the address, port, and account details. This helps prevent using Client A’s credentials on Client B’s machine.

  1. 01

    Check the instance and account

    Sign in to the console and open the instance details for the relevant order. Check the node, running status, connection address, SSH port, and default account. Use the default username and initial password provided with that instance. Don’t guess a generic username or reuse a password from another machine.

  2. 02

    Choose SSH or VNC

    Use SSH for command-line checks, code transfers, and CI jobs. Use VNC when you need the macOS graphical interface. Get the address and port from the relevant connection details; don’t assume both methods use the same port. After signing in, open the remote desktop from the instance details in the console.

  3. 03

    Change the initial password

    After your first successful login, change the initial password for the delivered account and update your team’s credential manager. Use separate credentials for interactive logins and automation where possible. After adding an SSH public key, keep your current session open and verify access in a second session before changing authentication settings.

Set the SSH command’s actual port

Set the username, address, and port from the console as local terminal variables: SSH_USER,SSH_HOST,SSH_PORT Then run:

ssh -p "$SSH_PORT" "$SSH_USER@$SSH_HOST"

Check the host fingerprint prompt the first time you connect. If a saved fingerprint changes, verify whether your node was reassigned before proceeding. Don’t dismiss the security warning.

Troubleshoot timeouts and authentication failures separately

For a timeout, first check that the instance is running and that the address and port are correct, then try again from another local network. For an authentication failure, confirm the username, password, or public key belongs to the current order and wasn’t copied with extra spaces. If SSH works but VNC doesn’t, check the remote desktop connection details separately. Don’t repeatedly reset the entire machine. Include the result for each connection method in your support ticket to help narrow down the cause.

One Mac per client

Keep signing assets with the right project

Dedicated physical resources don’t replace good asset management. Rent a separate machine for each client, then keep certificates, private keys, provisioning profiles, and build settings tied to the right project. This helps prevent identity mix-ups and builds crossing over between clients.

Make a checklist before migration

Have the client project lead confirm the bundle identifier, signing team, certificate purpose, and provisioning profile expiration. Move only the certificates and private keys needed for the current project, and record where they came from. Don’t copy the team’s entire history of signing files.

Handoff notes: client ID, order number, asset expiration dates.

Select the signing identity at build time

Set up a dedicated keychain for the project and specify which keychain and signing identity the build will use. Check that the team, app identifier, and provisioning profile match in the project and export settings. Verify an archive and export before adding the project to a batch pipeline.

Verification notes: archive result, export result, signing identity.

Revoke access after delivery

Export the build artifacts and settings the client needs to keep, then remove private keys, temporary tokens, and unused provisioning profiles from the machine. Revoke repository and CI credentials that are no longer needed. Stopping an order does not complete access revocation.

Closeout notes: backup location, access revoked, shutdown confirmed.

Don’t include secrets in support tickets

When troubleshooting signing, share redacted errors, certificate expiration dates, and provisioning profile match results. Never send private keys, certificate export passwords, full access tokens, or client source code. Remove sensitive values before sharing configuration details.

Get one reproducible build first

Pin the toolchain before automating builds

First verify the project in an interactive session, then rerun it in CI with the same account, directory, and environment variables. This helps distinguish toolchain, dependency, and signing issues instead of treating every failure as a machine problem.

CheckActionWhat to record
Xcode versionCheck the installed version. If you need a specific release, confirm it’s compatible with macOS, install the required toolchain, and select the matching developer directory.Xcode version, build version, and current developer directory.
Dependency installationKeep the dependency lockfile with the project and use its documented install command to avoid unintended upgrades on delivery day.Dependency lockfile, install command, and failure logs.
fastlaneTrack automation settings in version control. Pin dependencies with a Gemfile and run the relevant lane from the project directory.Ruby and Bundler versions, lane name, and exit code.
CI runner accountCheck the system account, working directory, and environment variables used by the runner. Verify it can access the project and its dedicated keychain.Account used to run jobs, trigger method, and redacted environment differences.
Artifact deliveryKeep test builds, archives, and exported artifacts distinct. Sync successful artifacts to the team’s designated storage location.Commit, build number, artifact location, and verification result.

Check the current toolchain first

These commands only read version information and the current path. Compare the results with project requirements before switching anything. Don’t change the global toolchain while a build is running.

xcodebuild -version
xcode-select -p
xcodebuild -showsdks
ruby --version
bundle --version

If two jobs for the same client need different toolchains, configure a separate developer directory for each. For incompatible environments or parallel isolation, use separate orders. CPU, memory, and SSD resources aren’t shared with other tenants, but jobs running on the same machine still compete for its resources.

Manual build succeeds, but CI signing fails

Compare the runner account, keychain search list, keychain unlock status, private key access, and provisioning profile, in that order. Then check whether CI is using a different export configuration or toolchain path. Keep relevant logs from before and after the first error instead of capturing only the final failure line. After fixing the issue, retest with the same commit.

Wrap up when the project ends

Manage renewals and shutdowns by order

Choose daily, weekly, monthly, or quarterly billing. The machine stops at the end of the term unless you renew. Add the instance expiration date to your project handoff notes instead of waiting until the final build to check how long it will remain available.

Renew if the project runs longer

Open the relevant order in the console and check its current billing period and expiration date. Complete the renewal using the option shown on the page. Then check the order status and new expiration date. Reaching the payment page doesn’t mean the renewal is complete.

Renewal checklist: order status and expiration date.

Back up before changing plans

Runtime M4 includes a Mac mini M4 with 16GB RAM and a 256GB SSD. Runtime M4 Pro includes a Mac mini M4 Pro with 64GB RAM and a 2TB SSD. Changing plans involves a different physical machine, so it isn’t a seamless upgrade while jobs are running. Back up first, then check available options and fees in the console.

Migration checklist: environment, signing assets, and build artifacts are recoverable.

Close out when delivery is complete

Export and verify everything before expiration, then make sure you don’t renew. The machine stops automatically when the term ends, followed by data erasure. Don’t leave your only copy of source code, signing assets, or build artifacts on a machine that’s about to expire.

Shutdown checklist: backup verified, credentials revoked.

Don’t rely on the disk as a backup after expiration

Check your order in the console for the exact data erasure timing after shutdown. This page does not promise an additional data retention period. Restoring machine access does not necessarily restore the original disk data. If you need to coordinate a migration, open a support ticket before expiration to confirm the arrangements. Don’t wait until after shutdown to retrieve files.

Service credits based on downtime

Clear steps for requesting service credits

99.9%

Service uptime commitment; nodes operate year-round, 365 days a year.

Based on a 30-day month, the downtime allowance is about 43 minutes. Downtime beyond that allowance is credited as additional service time, calculated by duration.

Submit within 7 days after service resumes

Sign in to the console and open a support ticket with your order number, node, affected connection method, and downtime start and end times. Include the time zone and attach redacted connection errors or build failure evidence.

Issues caused by your local network, your own actions, or force majeure are assessed separately under the service terms. Record what happened, but don’t assume a single failed build means the node was unavailable. The review and any service credit will be confirmed in the ticket.

Check the payment record first

Troubleshoot payments by provider

We accept only USDT-TRC20 and Visa, Mastercard, or Amex through Stripe. All payments are charged in US dollars (USD). Available payment options are determined by the checkout interface; this page does not replace your checkout status.

Check USDT-TRC20 payments

Check the network, receiving address, and amount due on the payment page for the current order. Don’t reuse an address from an old order. If you’ve transferred funds but the order hasn’t updated, keep the transaction hash, amount, and transfer time. Check on-chain confirmations before opening a support ticket.

Don’t send another transfer just to speed things up, and don’t rely on a transfer screenshot alone as proof that an order is paid. Order status in the console determines whether a machine is ready. We don’t promise a fixed on-chain confirmation time.

Ticket details: order number, transaction hash, amount, and time.

Troubleshoot Stripe card charges

Check your card and billing details, and whether your card issuer allows the current USD transaction. Complete any verification requested on the payment page. If you see an error, record its exact wording. Don’t repeatedly submit the same payment request.

If your bank shows a charge but the order hasn’t updated, return to the original order and refresh its status, then contact support. Share only the order number, transaction time, and redacted payment details. Never send your full card number, security code, or verification information.

Ticket details: order number, error message, and charge time.

Include the delivery context

One ticket per order issue

For connection, environment, payment, and service credit issues on an active machine, open a support ticket in the console after signing in. If multiple clients are affected, list each order and describe what they have in common. Don’t just write, “None of our machines can connect.”

  1. 01

    Identify the order

    Include the order number, model, and node. Our four available nodes are Singapore, Japan (Tokyo), South Korea (Seoul), and Hong Kong. Use the node shown on your order, and say whether the machine is still running and when it expires.

  2. 02

    Describe what happened and when

    State the expected and actual results, when the issue first occurred, and the time zone. For connection issues, specify SSH or VNC. For build issues, include the commit, toolchain version, and stage that failed. Describe ongoing and intermittent failures separately.

  3. 03

    List checks you’ve already tried

    Say whether you tried another local network, whether the other connection method works, and whether you retested with the same commit. Share relevant excerpts from redacted logs, including the surrounding error context. Don’t send credentials, private keys, or an entire client project.

Use the support email if you can’t sign in

Email support@runtimemac.com with your account email address and a description of the login issue. Email starts the conversation; it doesn’t replace your order status in the console. Once you can sign in, keep follow-up troubleshooting for that order in its support ticket.

Include your order number and get delivery back on track

Already have an order? Open a support ticket. Need a separate environment for your next client? Rent another dedicated physical Mac.